Short summary is the short read. Deep dive opens every story, chart and source.
01 · The Countdown
The Countdown
Ben’s Countdown to Mars
2Years
8Months
24Days
Every step from the first ship catch, now done on 11/14/2026, to the first human on Mars on 06/28/2029, each with a date, a confidence tag and the math. Flight 16, reported as Ship 43, has no SpaceX date yet (NET TBD). Our call, an estimate: early to mid January 2027 from LC-39A.
Key number998 days to the first humans on Mars (estimate)
First human steps onto Mars · 06/28/2029 · Estimate
How it works: each row before the goal is one step toward the first crew on Mars, and each step proves one thing. Rows after the goal come after the first crew lands. Later dates are estimates or agency targets, each with a confidence tag.
Estimate: the first base goes up at Arcadia Planitia. NASA’s 2019 ice map calls a large part of that plain “the most tempting target in the northern hemisphere,” with water ice less than a foot below the surface (NASA).
997d 17h 45m 52s
2 years, 8 months, 24 days on the calendar · 998 days from today in ET · The clock counts to noon ET (EDT) on 06/28/2029
Two timelines on one scale: how long we think Mars will take, and how long the Moon took.
“We choose to go to Mars” Baa’s bet: first humans on Mars 06/28/2029
Mars: from Starship Flight 1 (04/20/2023) to the first humans landing (estimate, 06/28/2029)
We are hereStarship Flight 1 · 04/2023Mars · 06/2029
“We choose to go to the Moon” JFK, Rice University, 09/12/1962 (Smithsonian)
Moon: from Kennedy’s goal (05/25/1961) to the Apollo 11 landing (07/20/1969)
Glenn orbits · ’62Gemini 8 docks · ’66Apollo 1 fire · ’67Apollo 8 · ’68Goal set in Congress · 05/1961Apollo 11 · 07/1969
Same scale: from Kennedy’s goal to the first Moon landing took 8 years, 1 month, 25 days. Starship Flight 1 to our Mars estimate is 6 years, 2 months, 8 days. Dates: NASA (speech, Glenn, Gemini 8, Apollo)
Start the Mars bar at
Donemediumlow confidence that a date holds within about 3 months · Life beyond Earth agency dates for missions that look for life’s ingredients and new worlds, set apart from the estimate chain · Open any row’s “show the math”
Before the chain
’02
SpaceX is founded
03/14/2002 · Incorporated in Delaware, per SpaceX’s filings (SEC; goal per SpaceX)
Proves: a company starts with the stated goal of helping people live on other planets.
Show the math
Done on 03/14/2002. Counting from then to today, 10/04/2026 ET:
Rest of 2002 after Mar 14: Mar 17 + Apr 30 + May 31 + Jun 30 + Jul 31 + Aug 31 + Sep 30 + Oct 31 + Nov 30 + Dec 31 = 292
04/20/2023 · First full Starship and Super Heavy launch (SpaceX)
Proves: the full stack can clear the pad. It was lost about 4 minutes after liftoff.
Show the math
Done on 04/20/2023. Counting from then to today, 10/04/2026 ET:
Rest of 2023 after Apr 20: Apr 10 + May 31 + Jun 30 + Jul 31 + Aug 31 + Sep 30 + Oct 31 + Nov 30 + Dec 31 = 255
Full years: 2024 (366, leap) + 2025 (365) = 731
Into 2026: Oct 4 is day 277 of the year
Total: 255 + 731 + 277 = 1,263 days
1,263 days ago.
✓3 years, 5 months, 14 days ago1,263 daysDone
#01
Booster caught by the launch tower
10/13/2024 · SpaceX Flight 5
Proves: Super Heavy can come home and be reused fast. Launches: 1
Show the math
Done on 10/13/2024. Counting from then to today, 10/04/2026 ET:
Rest of 2024 after Oct 13: Oct 18 + Nov 30 + Dec 31 = 79
Full years: 2025 (365) = 365
Into 2026: Oct 4 is day 277 of the year
Total: 79 + 365 + 277 = 721 days
721 days ago.
✓1 year, 11 months, 21 days ago721 daysDone
#02
Raptor engine relit in space
11/19/2024 · SpaceX Flight 6
Proves: the ship can fire its engines on command in orbit, needed for every deorbit and transfer burn. Launches: 1
Show the math
Done on 11/19/2024. Counting from then to today, 10/04/2026 ET:
Rest of 2024 after Nov 19: Nov 11 + Dec 31 = 42
Full years: 2025 (365) = 365
Into 2026: Oct 4 is day 277 of the year
Total: 42 + 365 + 277 = 684 days
684 days ago.
✓1 year, 10 months, 15 days ago684 daysDone
#03
A flown booster flies again
05/27/2025 · SpaceX Flight 9
Proves: boosters are reusable hardware, not throwaway stages. Launches: 1
Show the math
Done on 05/27/2025. Counting from then to today, 10/04/2026 ET:
Rest of 2025 after May 27: May 4 + Jun 30 + Jul 31 + Aug 31 + Sep 30 + Oct 31 + Nov 30 + Dec 31 = 218
Into 2026: Oct 4 is day 277 of the year
Total: 218 + 277 = 495 days
495 days ago.
✓1 year, 4 months, 7 days ago495 daysDone
#04
First orbital Starship and first V3s delivered to orbit
09/28/2026 · SpaceX Flight 14
Proves: the ship can reach orbit, do real work, and come back on target. Launches: 1
Show the math
Done on 09/28/2026. Counting from then to today, 10/04/2026 ET:
Sep 2 (rest of Sep after the 28th) + Oct 4 = 6
6 days ago.
✓6 days agoDone
Reported: SpaceX shared the first onboard photo of Starlink V3s deploying from Flight 14 (10/02/2026). All 26 are raising their orbits, and SpaceX says they add about 26 Tbps a flight, roughly 1 Tbps each (Starlust).
◇
MMX launches for Mars’ moons, to bring a piece of Phobos home
Proves: a human-made object can reach a full light-day from Earth.
Show the math
From today, 10/04/2026 ET, to 11/18/2026, counting calendar days:
Oct 27 (rest of Oct after the 4th) + Nov 18 = 45
On the calendar that is 1 month, 14 days: add 1 month to reach 11/04/2026, then 14 days more to 11/18/2026.
1 month, 14 days45 daysLife beyond Earth
#05
Ship caught by the launch tower
11/14/2026 · SpaceX Flight 15, Ship 42
Proved: the upper stage can come back from orbit and be caught whole. The Super Heavy booster on this flight was not caught. Launches: 1 (Flight 15)
Show the math
Done on 11/14/2026. Counting from then to today in ET.
Called for late November 2026, on Flight 15. The ship catch happened on 11/14/2026, about 22.5 hours after the 11/13/2026 liftoff from Pad 2.
✓doneDone
Reported: SpaceX caught Ship 42 at the Pad 2 tower on 11/14/2026, the first catch of an orbital Starship upper stage (SpaceX Flight 15 page, accessed 11/16/2026). Booster 22 aborted its own catch after a boostback burn that ended early and was lost after a landing burn over the Gulf. Next: Flight 16. Official date: NET TBD, no SpaceX announcement. Our call, an estimate: early to mid January 2027 from LC-39A. SpaceX keeps shortening the gaps, Booster 23 can static-fire at 39A, and Ship 43 cryo-proof is done. Trade press reports Ship 43 and Booster 23 as the vehicles, planned from LC-39A (NASASpaceflight, 10/25/2026).
#06
First propellant transfer between two ships in orbit
02/07/2028 · Estimate. Official date is NET TBD. SpaceX company target: early 2027 (Shotwell, Oct 20, via Ars Technica). Our earlier call was 11/27/2026. Later dates in this chain have not been re-dated.
Proves: a tanker docks with another Starship and pumps super-cold propellant into it. Without refilling, Starship cannot reach the Moon or Mars. Launches: 1 tanker, once a second ship is ready
Show the math
From today, 11/16/2026 ET, to 02/07/2028, counting calendar days:
Rest of 2026 after Nov 16: Nov 14 + Dec 31 = 45
Full years: 2027 (365) = 365
Into 2028: Feb 7 is day 38 of the year
Total: 45 + 365 + 38 = 448 days
On the calendar that is 1 year, 2 months, 22 days: add 1 year to reach 11/16/2027, then 2 months to reach 01/16/2028, then 22 days more to 02/07/2028.
1 year, 2 months, 22 days448 daysLow
#07
First uncrewed Starship launches for Mars: a small landing demo
NET TBD · Official date not announced. Our earlier call was 12/01/2026, near the end of this window (closes 12/08). We have not picked a new day.
Proves: a Starship can leave Earth orbit, cross to Mars and land. SpaceX told investors in 02/2026 that it would put the Moon first and try Mars later (Reuters). SpaceX has not announced a 2026 Mars launch. Launches: 1 ship with a light payload, once a refill is possible
Show the math
No countdown. Official date is NET TBD. Our earlier call was 12/01/2026. We have not picked a new day, and the July 2027 landing date later in this chain has not been re-dated.
NET TBDLow
◇
Europa Clipper swings past Earth, about 2,000 miles up
Proves: a nuclear-powered rotorcraft leaves for Saturn’s Moon Titan, arriving 2034.
Show the math
From today, 10/04/2026 ET, to 07/05/2028, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
Full years: 2027 (365) = 365
Into 2028: Jul 5 is day 187 of the year
Total: 88 + 365 + 187 = 640 days
On the calendar that is 1 year, 9 months, 1 day: add 1 year to reach 10/04/2027, then 9 months to reach 07/04/2028, then 1 day more to 07/05/2028.
1 year, 9 months, 1 day640 daysLife beyond Earth
#17
First crew lands on the Moon in a Starship
09/15/2028 · Estimate · Artemis IV, NASA target 2028
Proves: Starship can carry people down to another world and back up. Launches: 1 lander, 1 crew rocket, about 10+ tankers
Show the math
From today, 10/04/2026 ET, to 09/15/2028, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
Full years: 2027 (365) = 365
Into 2028: Sep 15 is day 259 of the year
Total: 88 + 365 + 259 = 712 days
On the calendar that is 1 year, 11 months, 11 days: add 1 year to reach 10/04/2027, then 11 months to reach 09/04/2028, then 11 days more to 09/15/2028.
1 year, 11 months, 11 days712 daysLow
◇
SR-1 Freedom, the first fission-powered (a small nuclear reactor) interplanetary spacecraft, launches for Mars
Proves: nuclear electric propulsion can push a spacecraft between planets.
Show the math
From today, 10/04/2026 ET, to 12/01/2028, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
Full years: 2027 (365) = 365
Into 2028: Dec 1 is day 336 of the year
Total: 88 + 365 + 336 = 789 days
On the calendar that is 2 years, 1 month, 27 days: add 2 years to reach 10/04/2028, then 1 month to reach 11/04/2028, then 27 days more to 12/01/2028.
NASA gives a month; 12/01 is used for the math, so read it as about 789.
About 2 years, 1 month, 27 days≈ 789 daysLife beyond Earth
#18
Cargo ships with power, a propellant plant and habitats launch for Mars
12/01/2028 · Estimate (late-2028 window, two weeks before the crew)
Proves: the plant that will make fuel for the trip home leaves in the same window as the crew. Launches: about 4 ships and dozens of tankers
Show the math
From today, 10/04/2026 ET, to 12/01/2028, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
Full years: 2027 (365) = 365
Into 2028: Dec 1 is day 336 of the year
Total: 88 + 365 + 336 = 789 days
On the calendar that is 2 years, 1 month, 27 days: add 2 years to reach 10/04/2028, then 1 month to reach 11/04/2028, then 27 days more to 12/01/2028.
2 years, 1 month, 27 days789 daysLow
#19
First crew launches for Mars
12/15/2028 · Estimate (late-2028 window)
Proves: people leave Earth on a fully refilled ship. Launches: 1 crew ship plus dozens of tankers
Show the math
From today, 10/04/2026 ET, to 12/15/2028, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
Full years: 2027 (365) = 365
Into 2028: Dec 15 is day 350 of the year
Total: 88 + 365 + 350 = 803 days
On the calendar that is 2 years, 2 months, 11 days: add 2 years to reach 10/04/2028, then 2 months to reach 12/04/2028, then 11 days more to 12/15/2028.
2 years, 2 months, 11 days803 daysLow
#20
Power, propellant plant and habitats land on Mars
06/14/2029 · Estimate (195-day trip, two weeks before the crew)
Proves: the hardware survives landing and is ready when the crew arrives. Launches: 0 (already on the way)
Show the math
From today, 10/04/2026 ET, to 06/14/2029, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
Full years: 2027 (365) + 2028 (366, leap) = 731
Into 2029: Jun 14 is day 165 of the year
Total: 88 + 731 + 165 = 984 days
On the calendar that is 2 years, 8 months, 10 days: add 2 years to reach 10/04/2028, then 8 months to reach 06/04/2029, then 10 days more to 06/14/2029.
Proves: the whole chain works end to end. Launches: 0 (already on the way)
Show the math
From today, 10/04/2026 ET, to 06/28/2029, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
Full years: 2027 (365) + 2028 (366, leap) = 731
Into 2029: Jun 28 is day 179 of the year
Total: 88 + 731 + 179 = 998 days
On the calendar that is 2 years, 8 months, 24 days: add 2 years to reach 10/04/2028, then 8 months to reach 06/04/2029, then 24 days more to 06/28/2029.
On Mars that is about 971 sols (998 × 24 h ÷ 24.6597 h per sol; sol length from NASA GISS Mars24). The big clock counts to noon ET on 06/28/2029 (EDT, UTC−4), so it can read a few hours off the calendar count.
2 years, 8 months, 24 days998 daysLow
After the first crew
#22
First rocket propellant made on Mars
03/01/2030 · Estimate · After the first crew
Proves: methane and oxygen from Martian CO2 and ice, so a ship can fly home. Launches: 0
Show the math
From today, 10/04/2026 ET, to 03/01/2030, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
On the calendar that is 3 years, 4 months, 25 days: add 3 years to reach 10/04/2029, then 4 months to reach 02/04/2030, then 25 days more to 03/01/2030.
03/01/2025, about 550 mi (884 km) above Mars (NASA)
Done
3
Earth gravity assist
12/03/2026, about 2,000 mi (3,200 km) above Earth (NASA target)
60 days from today
4
Total trip time
10/14/2024 to 04/11/2030
2,005 days (5.49 yr; NASA says “about 5½ years”)
5
Elapsed
10/14/2024 to today
720 days (35.9% of the time)
6
Days remaining
Calendar days, worked out above
1,285 days
7
Total path length
Sum of 2,004 daily straight-line steps along JPL’s heliocentric trajectory
2.88 billion km (1.79 billion mi). NASA quotes 2.9 billion km, so the method checks out
8
Distance flown, 10/04/2026
Same sum, launch to 10/04/2026
1.35 billion km (837 million mi), 46.7%
9
Distance to go, 10/04/2026
Same sum, 10/04/2026 to 04/11/2030
1.54 billion km (954 million mi)
10
Average speed needed for the rest
1.535 billion km ÷ (1,285 days × 86,400 s)
13.8 km/s (about 31,000 mph)
11
Speed on 10/04/2026, relative to the Sun
JPL vectors
38.4 km/s (85,800 mph), fast because it is falling back toward Earth for the flyby
12
Speed at Jupiter, relative to the Sun
JPL vectors, 04/11/2030
7.6 km/s (16,900 mph); it slows as it climbs away from the Sun
13
Distance from Earth, 10/04/2026
JPL Horizons, 16:00 UTC
0.439 AU = 65.7 million km; radio takes 3.7 minutes one way
14
Signal delay at arrival
4.553 AU × 499.0 s per AU
37.9 minutes one way
15
Then what
JPL Horizons header, NASA
About 49 Europa flybys, as low as 25 km, prime mission to 2034
The curious bit: Clipper has flown almost half the distance in about a third of the time. It moves fastest near the Sun and coasts slower and slower on the long climb out to Jupiter.
Method: daily straight-line steps slightly under-count the curved path, most around the flybys; the match to NASA’s 2.9 billion km says the error is small. Sources: NASA mission timeline · JPL press kit · JPL Horizons (−159).
3 years, 6 months, 7 days1,285 daysLife beyond Earth
#23
Second Mars wave: more crew, power and cargo launch
02/20/2031 · Estimate (early-2031 window) · After the first crew
Proves: back-to-back windows: ships can leave every 26 months. Launches: about 4+ ships and dozens of tankers
Show the math
From today, 10/04/2026 ET, to 02/20/2031, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
On the calendar that is 4 years, 4 months, 16 days: add 4 years to reach 10/04/2030, then 4 months to reach 02/04/2031, then 16 days more to 02/20/2031.
On the calendar that is 4 years, 9 months, 17 days: add 4 years to reach 10/04/2030, then 9 months to reach 07/04/2031, then 17 days more to 07/21/2031.
4 years, 9 months, 17 days1,751 daysLife beyond Earth
#24
Third Mars wave: habitats, spare ships, and supplies launch
04/20/2033 · Estimate (spring-2033 window) · After the first crew
Proves: the base grows: more room, more spares and more people. Launches: about 4+ ships and dozens of tankers
Show the math
From today, 10/04/2026 ET, to 04/20/2033, counting calendar days:
Rest of 2026 after Oct 4: Oct 27 + Nov 30 + Dec 31 = 88
On the calendar that is 6 years, 6 months, 16 days: add 6 years to reach 10/04/2032, then 6 months to reach 04/04/2033, then 16 days more to 04/20/2033.
6 years, 6 months, 16 days2,390 daysLow
What moved: we re-dated the whole chain to match our Mars estimate. One uncrewed Starship leaves for Mars in the window open now (12/01/2026) and lands 07/01/2027 (was 12/15/2028 and 07/15/2029). The first crew leaves 12/15/2028 and steps onto Mars 06/28/2029 (was 07/10/2035 and 01/20/2036), with power, a propellant plant and habitats on cargo ships in the same window. The Moon comes first: an uncrewed Starship lands there 04/15/2027 (was 10/15/2028) and a crew follows 09/15/2028 (was 11/15/2029). Refilling, weekly launches and the months-long crew test moved into 2027 and early 2028 to fit. The ship catch moved earlier too: Flight 15, late 11/2026, not 03/20/2027.
What moved, 11/16/2026: Flight 15 is done (liftoff 11/13, ship catch 11/14). Flight 16 is next, official date NET TBD, our call early to mid January 2027 from LC-39A. The first propellant transfer and the uncrewed Mars demo are now official NET TBD. Our earlier calls were 11/27/2026 and 12/01/2026; we have not picked new days, and later dates in the chain have not been re-dated. SpaceX’s company target for the transfer is early 2027 (Shotwell, Oct 20).
What moved, 11/21/2026: We picked 02/07/2028 for the first propellant transfer between two Starships. Official date is still NET TBD. SpaceX company target remains early 2027 (Shotwell, Oct 20). Later dates in the chain have not been re-dated.
The rule: calendar days from today in eastern time. The page recounts live in your browser at midnight ET; with scripts off it shows the numbers as of Monday 11/16/2026.
02 · Next Milestones
What to Watch Next
Next up · Starship
Flight 16, Ship 43, official date NET TBD
NET TBD no SpaceX date yet
Our call (estimate, not a SpaceX date): early to mid January 2027 from LC-39A. SpaceX keeps shortening the gaps, Booster 23 can static-fire at 39A, and Ship 43 cryo-proof is done.
Flight 15, on 11/13 and 11/14/2026, made the first ship catch: Ship 42 came home to the Pad 2 tower after about 22.5 hours and 26 Starlink V3 satellites. Booster 22 was not caught. Trade press reports Flight 16 will use Ship 43 and Booster 23 and is planned as the first Starship launch from LC-39A in Florida. SpaceX has not announced a date, so the official line stays NET TBD. Our call is earlier than NASASpaceflight's Oct 25 sequence, which pointed to no earlier than late January 2027 if no issues, because SpaceX has shortened those gaps before, the booster can be fired at the Florida pad, and Ship 43 has already finished cryo-proof.
Baa’s bet on the Flight 15 ship catch: hit, 11/14/2026. New bet: Flight 16 from LC-39A in early to mid January 2027 (estimate). Official date: NET TBD.
Starlink subscribers on 06/30/2026, double the 6.0m a year earlier (SpaceX 10-Q).
12.0m · 06/30/2026100m
Baa’s bet: Starlink 100m subscribers 02/2041
Estimate (growth-rate math):
Inputs. 12.0 million subscribers as of 06/30/2026; 6.0 million a year earlier (SpaceX Q2 / 10-Q, SEC). Net adds in the year: +6.0 million. Q2 alone added >1.7 million (Gwynne Shotwell on the earnings call).
Gap. 100 − 12.0 = 88.0 million more to the milestone.
Pace A (trailing 12 months). 88.0 ÷ 6.0 ≈ 14.7 years from 06/30/2026 → about 02/2041.
Pace B (Q2 annualized). 1.7 × 4 = 6.8 million/year → 88.0 ÷ 6.8 ≈ 12.9 years → about 06/2039.
Public forecasts (as-of mid-2026). Deutsche Bank ~102m by 2031 · Moffett ~97m by 2031 · New Street ~100m by 2034 · TMF ~46m consumer in 2030 (no 100m date published).
Result used. The card date is pace A (02/2041): the slower, trailing-year rate. No Kalshi/Polymarket contract on “100m Starlink” was found for this edition, so the headline date uses reported growth only; forecasts sit as a cross-check.
The headline bet is first humans on Mars 06/28/2029, after the first crew on the Moon in a Starship 09/15/2028. Each call gets a grade when its date comes.
The headline bet low
Baa’s bet: first humans on Mars 06/28/2029
2 years, 8 months, 24 days 998 days from today in ET
WhyThe first crew launches 12/15/2028 and makes about a 6-month trip. NASA’s ice map puts water less than a foot down at Arcadia Planitia. The reasoning
The first human steps onto Mars, at Arcadia Planitia · Estimate
The second big one low
Baa’s bet: first crew on the Moon in a Starship 09/15/2028
1 year, 11 months, 11 days 712 days from today in ET
WhyNASA targets 2028; the crewed lander must first prove refilling, a Moon landing and months of crew life. The reasoning
Artemis IV: the first crew lands on the Moon in a Starship · Estimate
More estimates
Late 11/2026 · hit 11/14/2026
Starship Flight 15 makes the first ship catch at the launch tower
Baa’s bet: first Starship ship catch late 11/2026 · hit
Hit
Early to mid 01/2027
Starship Flight 16 launches from LC-39A in early to mid January 2027
Baa’s bet: Flight 16 from LC-39A early to mid January 2027 · official date NET TBD
Low
04/15/2027
The first uncrewed Starship lands on the Moon
Baa’s bet: first uncrewed Starship on the Moon 04/15/2027
Low
End of 2030
About 1 GW of computing in orbit, all operators (base case; range 20 MW to 15 GW)
Baa’s bet: about 1 GW of computing in orbit by end of 2030
Low
2031
The first Mars rock in a lab on Earth is China’s, from Tianwen-3
Baa’s bet: first Mars rock on Earth is China’s, 2031
Medium
2055
The first probe melts through Europa’s ice and looks for life in its ocean (launch about 2047)
NASA’s Chief Likes the Odds That Mars Once Had Life.
$10b+What Mars sample return had grown to, from up to $4b
$2bAlready spent before the cancellation
$110mKept for Mars future missions tech, FY2026
2031China’s Tianwen-3 samples due on Earth (China target)
Isaacman to House appropriators, 04/27/2026; FY2026 appropriations; Xinhua. Sources in the story.
NASA’s chief sees “a very good chance” that Mars samples will show past life, but the US plan to bring them home is cancelled. Estimate: China’s Tianwen-3 brings the first Mars rock to a lab on Earth.
Key date2031 China’s Mars samples due on Earth (China target)
NASA’s 15th administrator, Jared Isaacman, says there is “a very good chance” that Mars samples will show microbial life lived there once. The hard part is getting the samples to Earth. The program to bring Perseverance’s samples to Earth was cancelled in January.
What happened
Isaacman made the claim on Pod Force One, the NY Post’s podcast, on 08/05/2026. He sees “a very good chance” of proving that microbial life once existed on Mars, with samples brought back to Earth. The Post’s write-up has those samples back in the next decade or so.
In April, during Artemis II, he told CNN: “I would say the odds that we will find something at some point to suggest that we are not alone are pretty high.” He pointed to the two trillion galaxies out there. The search, he said, “goes to the heart of many things that we do at Nasa.”
Why it matters
A yes would mean life once existed on a second world in our solar system. Proving it needs Mars rock in a lab on Earth, and no US mission to bring that rock back is funded today.
Congress’s FY2026 appropriations “does not support the existing Mars Sample Return (MSR) program.” The bill kept $110 million for Mars Future Missions technology. On 04/27/2026 Isaacman told House appropriators the mission “was conceived to cost up to $4 billion and in just a few years ballooned to over $10 billion, with $2 billion in taxpayer funds already spent.” He called the cancellation rightful: “This is not good capital allocation or execution.”
China has its own plan. Tianwen-3 aims to launch around 2028 and return samples in 2031 (China target). The mission’s chief scientist calls signs of life its top goal. China expects to pick the landing site by the end of 2026 (Xinhua).
How it works
A rover cannot prove life. It can only find clues. Scientists call a strong clue a potential biosignature: something life might have made, which needs more study before anyone can say yes or no.
The best clue so far is the “Sapphire Canyon” sample. Perseverance drilled it in July 2024 from a rock called “Cheyava Falls,” in an old dry riverbed in Jezero Crater. NASA called it a potential biosignature on 09/10/2025 (NASA).
The rock has small “leopard spots.” They hold two iron minerals, vivianite and greigite, next to organic carbon. On Earth, some microbes make this pair when they get energy from chemistry. Chemistry without life can make it too, for example with high heat or acid. Cheyava Falls shows no sign of either. To tell life from chemistry, scientists need instruments far more sensitive than any rover carries.
Perseverance keeps driving. On 09/28/2026 it was about 100 feet short of Opportunity’s 28.06-mile record for driving on another world (KCRA). Farther out, Europa Clipper is not a life-detection mission. It will check whether Europa’s ocean has the ingredients and energy for life (NASA). It reaches Jupiter on 04/11/2030 (NASA target).
Estimate
The first Mars rock to reach a lab on Earth will most likely be China’s, from Tianwen-3. The signal of a US comeback: a sample-return line in the final FY2027 budget.
On Mars Sample Return, to House appropriators · 04/27/2026 · Testimony
The Orbit Dial
Mars Transfer Windows
Earth laps Mars about once every 26 months. A ship leaves when Mars is about 44° ahead, so Mars reaches the meeting point when the ship does. Step through it, then explore.
DateOct 202610/04/2026
Mars leads Earth by76°Textbook launch: about 44°
Earth to Mars1.64 AU13.6 light-minutes
Launch windowOpenCheapest launch 10/29/2026
Open 09/23/2026 to 12/08/2026. NASA’s ESCAPADE twins are using this window: they loop back past Earth this fall and slingshot to Mars, arriving 09/2027 (NASA target).
Calc. planet positions from JPL’s approximate orbital elements3 (good to about a minute of arc here; checked against JPL Horizons), drawn to scale (1 AU is the Earth-Sun distance, about 150 million km) and flattened onto one plane; Mars’ tilt of about 1.85° is left out. Purple bands mark windows where the cheapest trip needs a launch energy (C3)1 of 20 km²/s² or less, from a simple two-body Lambert solve2 on the same orbits; it gives 14.4 for Perseverance’s 2020 trajectory, against 14.49 flown (ULA). The dashed line is the textbook half-ellipse path; the hollow circle is where Mars would be when a ship on it arrives. Dots on the track are estimates. Time on the dial is sped up for the animation; when a window opens the dial pauses briefly, the transfer path blinks, and decorative rockets ride the textbook path (not a real launch timeline). Little guys and rockets not to scale (or real).Dig inCloseWho he is, what MSR cost, what is left, what to watch
Context
Isaacman was nominated 11/04/2025, confirmed by the Senate 12/17/2025 (67 to 30) and sworn in 12/18/2025. He was still in the job this week: a WESH interview after the Crew-13 launch on 10/01/2026, and the Boeing and NASA Starliner update on 09/28/2026.
The numbers
Up to $4 billion MSR’s original cost, in Isaacman’s testimony
Over $10 billion what it grew to, “in just a few years”
$2 billion already spent, same testimony
$110 million kept for Mars Future Missions technology, FY2026
Around 2028 / 2031 Tianwen-3 launch and return (China target); landing site due by the end of 2026
28.06 miles Opportunity’s record for driving on another world; Perseverance was about 100 feet short on 09/28/2026
04/11/2030 Europa Clipper at Jupiter (NASA target)
Why it matters
For Isaacman, the strongest way to prove past life is Mars rock on Earth, and no funded mission can bring those samples to Earth today. Clipper and Dragonfly can show whether ocean worlds have what life needs. Neither is built to detect life itself.
What to watch
Money. NASA runs on a stopgap at its FY2026 level, $24.4 billion, until 12/11/2026. The White House asked for $18.8 billion for FY2027, and the House bill would trim science from $7.3 billion to $6 billion (SpacePolicyOnline). A sample-return line in the final bill is the signal to watch
Perseverance passing Opportunity’s driving record, any day now
Europa Clipper’s Earth flyby on 12/03/2026 (NASA target)
Dragonfly’s launch window, 07/05 to 07/25/2028 (NASA target)
01/2027Flight 16 from LC-39A (our call, estimate; official date NET TBD)
07/2027Uncrewed Starship lands on Mars (estimate)
09/2028Crew back on the Moon (estimate; NASA targets 2028)
06/2029First crew lands on Mars (estimate)
Estimates are BAA’s, from public sources. The full list, with agency and company targets, is in the deep dive.
Robots go first — lunar south pole, Mars’s moons, Jupiter, Titan. Estimate: a crew walks on the Moon again in Sep 2028, and on Mars in Jun 2029. Between those dates sit the hard ops: propellant refill (the ship catch is now done), lander readiness, and the 26-month Mars window.
Key dates09/15/2028 crew on the Moon · 06/28/2029 crew on Mars (estimates)
The next five years read less like a trailer and more like a build sequence. Uncrewed ships go first: Chang’e-7 and Blue Moon Mark 1 toward the lunar south pole, JAXA’s MMX to Phobos and Deimos, Europa Clipper toward Jupiter, Dragonfly toward Titan. People follow in Earth orbit in 2027 (NASA target), walk on the Moon again in Sep 2028 (estimate; NASA targets 2028), and — if the windows and the hardware hold — land on Mars in Jun 2029 at Arcadia Planitia (estimate).
What has to go right is mostly operational. Starship has now caught a returning ship at the tower (Flight 15, 11/14/2026). It still has to transfer propellant in orbit before any Mars or heavy Moon shot. Flight 16, reported as Ship 43 from LC-39A, has no SpaceX date yet (NET TBD). Our call, an estimate: early to mid January 2027 from LC-39A, because SpaceX keeps shortening the gaps, Booster 23 can static-fire at 39A, and Ship 43 cryo-proof is done. Artemis needs a lander ready when Orion is. Blue Moon Mark 1 waits on New Glenn flying again and pad recovery. China already slipped Chang’e-7 off its 2026 window. Mars only opens about every 26 months, so a missed departure is a two-year wait. Sample return is politics now: the US program was cancelled; China’s Tianwen-3 targets a 2031 return.
Next steps look like: a first propellant transfer (our call 02/07/2028; official date NET TBD; SpaceX has pointed to early 2027), then an uncrewed Starship toward Mars (official date NET TBD; our earlier December 2026 call is not announced and has not been re-dated as a chain), put an uncrewed Starship on the Moon in Apr 2027 (estimate), then stack crew missions on what those demos teach. The year lists below are the scorecard — agency and company targets labeled as targets, estimates labeled as estimates.
Why it matters
These flights decide who learns to land, stay, and leave again — and who gets the first solid answers about water at the south pole, samples from Mars’s moons, and whether a crew can live off-Earth for months. Agencies and investors are betting on the same chain: catch, refill, lander, then people.
How it works
Physics sets the calendar. Mars transfer windows open about every 26 months; miss one and you wait for the next. Dragonfly’s Titan window is 07/05 to 07/25/2028 (NASA target). Anything heavy enough for Moon or Mars cargo also needs orbital propellant transfer — tankers fill a ship in Earth orbit before it leaves. That is why ship catch and refill sit at the front of the list: without them, the later dates stay on paper.
Estimate
Flight 15 ship catch: done, 11/14/2026. Flight 16 official date: NET TBD. Our call, an estimate: early to mid January 2027 from LC-39A. Our call for the first propellant transfer is 02/07/2028 (official date NET TBD). An uncrewed Starship for Mars is official NET TBD (our earlier call was a Dec 2026 demo, landing Jul 2027; that launch is not announced, and the landing date has not been re-dated). An uncrewed Starship lands on the Moon in Apr 2027; a crew follows in Sep 2028. The first crew leaves for Mars in Dec 2028 and lands in Jun 2029. Chang’e-7 launches Mar 2027, lands Jun 2027. Blue Moon Mark 1 in fall 2027, once New Glenn flies again. Each step depends on the one before it holding.
2026
10/19 · JAXA target MMX launches on H3 for Phobos and Deimos, a sample return
11/18 · NASA Voyager 1 reaches one light-day
11/14/2026 · Done Starship Flight 15 makes the first ship catch at the launch tower. Next: Flight 16, Ship 43, official date NET TBD. Our call, an estimate: early to mid January 2027 from LC-39A
NET TBD one uncrewed Starship launches for Mars, a small landing demo. Official date not announced. Our earlier call was 12/01/2026, near the end of this window (closes 12/08). We have not picked a new day, and later landing dates in this chain have not been re-dated.
12/03 · NASA target Europa Clipper Earth flyby
12/2026 or 01/2027 · NASA/Boeing target uncrewed Starliner-1 to the station; crewed Starliner-2 in 2028 (NASA target)
By year end · Company target Amazon Leo limited commercial service. On 11/15/2026 a ULA Vulcan launch of 40 Amazon Leo satellites failed to reach orbit; return to flight is TBD. Amazon has not issued a new service date.
Q4 · ISRO target Gaganyaan G1, uncrewed
2027
03/2027 · Estimate Chang’e-7 launches for the lunar south pole, after China called off its 2026 window
04/2027 · Estimate an uncrewed Starship lands on the Moon (SpaceX targeted 03/2027)
Early 2027 · Company targets Vast Haven-1, Stoke Nova first orbital try, Google’s two-satellite Suncatcher
Summer · NASA target Artemis III: Orion with commercial landers in Earth orbit
2027 onward · NASA target uncrewed landers and rovers to the south pole, “near monthly”
06/2027 · Estimate Chang’e-7 lands, after about three months scouting from orbit
07/2027 · Estimate the first Starship lands on Mars
09/2027 · NASA target ESCAPADE arrives at Mars
Fall 2027 · Estimate Blue Moon Mark 1 lander with two NASA payloads (01/2027 on NASA’s list), once New Glenn is flying again
Q4 · SpaceX target first Starmind AI1 orbital compute satellites
2028
02/07/2028 · Estimate first propellant transfer between two Starships. Official date not announced. SpaceX company target: early 2027 (Shotwell, Oct 20). This is our call, not a SpaceX date. Our earlier call was 11/27/2026. Later dates in this chain have not been re-dated.
2028 · NASA target Artemis IV: astronauts on the Moon (estimate: 09/2028, in a Starship)
07/05 to 07/25 · NASA target Dragonfly launches for Titan, arriving 2034
2028 · China target Tianwen-3 launches for Mars samples, return 2031
12/2028 · NASA target SR-1 Freedom to Mars, carrying three SkyFall helicopters
12/01/2028 · Estimate cargo ships with power, a propellant plant and habitats leave for Mars
12/15/2028 · Estimate the first crew launches for Mars
2029
06/2029 · Estimate the first people step onto Mars, at Arcadia Planitia
2030 and 2031
By 2030 · China target first Chinese crew on the Moon
04/11/2030 · NASA target Europa Clipper at Jupiter
07/21/2031 · ESA nominal Juice at Jupiter
Dig inCloseSources for every line
What to watch
Whether Flight 16 holds our early-to-mid January 2027 call from LC-39A (official date still NET TBD), the first propellant transfer, and the Starliner-1 date.
1 GWComputing in orbit by end of 2030 (estimate, base case)
1mSatellites, the most any orbital compute plan asks for
Company targets are company targets. Sources in the story.
New, Oct 2026: Google’s first TPUs are computing in orbit, and Google’s own paper estimates about 1,800 Starship launches before launch is cheap enough to rival ground power costs. The first orbital computers are fridge-scale — about 1 kW each. Estimate: about 1 GW in orbit by the end of 2030. The ceiling is heat: space has no air to cool chips, only radiators.
Key numberAbout 1 GW in orbit by the end of 2030 (estimate)
On the ground, AI needs power plants, land, and water or air for cooling. In orbit you get steady sunlight and room to grow — but every watt the chips use becomes heat you have to shine away as infrared. Today’s tests are tiny: Google’s Suncatcher (10/01/2026) runs about 1 kW in 15-minute bursts while the radiators catch up. Starcloud-1 trained a small model with one GPU. The dream is fleets; the ops reality is mass to orbit, radiator area, and chips that survive radiation.
What is likely: more fridge-scale demos through 2027, then SpaceX’s Starmind AI1 birds (175 kW average a satellite, first launches Q4 2027, SpaceX target) if Starship cadence and manufacturing hold. The largest filings ask for up to 1 million satellites (SpaceX, accepted for filing, not approved) and 51,600 (Blue Origin’s Project Sunrise). What has to go right is boring and hard: launch cost down, radiators that keep up, and enough tanker and pad time left after Moon and Mars traffic.
Next steps look like reading Suncatcher’s first results, watching Starcloud-2’s date, and any FCC action on the big constellations. The ladder below scales from one GPU to a gigawatt a year of new compute.
Why it matters
If serious computing moves upstairs, the bottleneck on AI shifts from power permits and land to launch cadence and how fast you can radiate heat. That is a different industry map — and it shares pads with the Moon and Mars stack.
How it works
An orbital data center is a satellite with chips, big solar panels, and big radiators. Chips turn power into heat; with no air or water, radiators dump that heat as infrared light. That is why early tests burst and idle. Radiation also flips bits in off-the-shelf chips, so error handling and shielding matter as much as raw flops.
Estimate
About 1 GW of computing in orbit by the end of 2030 (base case) — a little under SpaceX’s 1.4 GW ground AI nameplate as of 06/30/2026. Low case: today’s tests never become fleets. High case: most of the big plan arrives about a year late. Heat and launch mass, not demand, are the hard limits in this window.
1 GPUStarcloud-1, one Nvidia H100 (an AI chip), 11/2025
About 1 kWGoogle’s Suncatcher test, four TPUs (Google’s AI chips), 10/01/2026
1.5 kW a satelliteTakeMe2Space, two laser-linked satellites, late 2028 (company target)
175 kW a satelliteSpaceX AI1, average compute, first launches Q4 2027 (SpaceX target)
1 GW a yearSpaceX’s goal for new compute launched each year by the end of 2027, then 10 times more each year
How many launches is a gigawatt
Context: 1 GW is about 2% of today’s global data-center electricity draw. The IEA puts data centres at about 485 TWh in 2025 (~55 GW average: 485 ÷ 8,760), up from 415 TWh (~47 GW) in 2024 (IEA, Key Questions on Energy and AI). So one gigawatt in orbit is a small slice of Earth’s data-center fleet — and about three-quarters of SpaceX’s own 1.4 GW ground AI nameplate as of 06/30/2026 (SpaceX Q2, SEC). Move the sliders to see how many Starship launches that takes.
133 launches for 1 GW (7.5 MW a launch)
Calc: launches = 1,000,000 kW ÷ (payload tons × kW per ton). Defaults: Starship V3’s 100+ t design figure (not yet shown: Flight 14 reached orbit on 09/28/2026 with 26 V3 Starlinks, and SpaceX gave no payload mass) and SpaceX’s 75 kW per ton for AI1 (Starmind page, 10/04/2026). SpaceX’s own 100 GW math works out to 100 kW per ton.
Simplifications: nameplate compute power, not sustained after radiator limits; assumes every ton is AI1 payload; ignores tanker flights needed to refill the Mars/Moon ships that share the pads.
Oct 2026 · Reported: Google’s first TPUs reached orbit on 10/01/2026 on a Planet-built prototype satellite that flew on a Falcon 9, and they run in roughly 15-minute bursts to protect power and heat. Next: two laser-linked satellites in 2027 (Google target), and long term an 81-satellite formation. Google’s own estimate (peer-reviewed white paper, due in Joule): launch prices near $200/kg by about 2035 would take about 370,000 t more to orbit, or about 1,800 Starship launches at 200 t each. That figure is Google’s, not this page’s. Calc, against the sliders: 1 GW at the defaults is 133 launches of 100 t; Google’s 370,000 t at 75 kW per ton would be about 28 GW. For comparison, Cowboy Space Corp plans an Apr 2027 mission running Nvidia GB200 chips in orbit (company target). (The AI Insider, 10/05/2026 · Joule)
Flying now or just launched
Starcloud-1 launched 11/2025 and trained a small language model in orbit.
Axiom Space launched its first two orbital data center nodes on 01/11/2026 with Kepler’s optical relays.
ADA Space (China) has 12 “Three-Body” computing satellites up; the company plans 2,800 compute satellites by 2035.
Supercomputing-1 (China) launched 09/20/2026 to process its own Earth pictures in orbit.
Google Suncatcher launched 10/01/2026 with Planet: four TPUs, about 1 kW, running Gemini in 15-minute bursts while the radiators catch up.
TakeMe2Space MOI-1a (India) was scheduled on the same 10/01/2026 rideshare.
Announced, owner on every date
SpaceX Starmind AI1: first launches Q4 2027 (SpaceX target); deployment “as early as 2028” (SEC filing). FCC application for up to 1 million satellites, accepted for filing 02/04/2026, not approved.
Blue Origin Project Sunrise: FCC application for up to 51,600 satellites; NASA filed concerns in 05/2026. No date or power figure found.
Starcloud: an AI payload to lunar orbit on Firefly’s Elytra, NET 2028 (company target).
TakeMe2Space: two 1.5 kW satellites with 10 Nvidia Thor GPUs each, late 2028 (company target).
Anthropic will study using SpaceX orbital data centers. Exploratory, no contract disclosed.
Dig inCloseThe hard parts, the specs, sources
The hard parts
Heat has to be radiated away, since there is no air or water to carry it (Google runs 15-minute bursts; SpaceX lists radiators, vapor chambers and loops). Radiation flips bits in off-the-shelf chips. Launch mass is the biggest limit: SpaceX’s own math is about 1 million tons a year to orbit for 100 GW a year. NASA’s administrator, 08/05/2026: “I would not bet against the orbital data centers.”
The numbers
250 kW peak / 175 kW average AI1 compute per satellite, SpaceX Starmind page as fetched 10/04/2026
75 kW per ton same page; an 08/25/2026 report quoted 70, so the published spec has grown since August
1.4 GW SpaceX’s ground AI compute, nameplate, 06/30/2026 (SEC)
What to watch
First results from Google’s test, Starcloud-2’s date, and any FCC action on the SpaceX and Blue Origin filings.
Share of the internet served from spaceprojectionThe rest comes over the ground: fiber, cable, cell towers. Direct-to-phone satellite service is left out.
2030, base: space 1.49% · Ground 98.51%
MoreHow to read the charts, and the assumptions
Dig inCloseAssumptions, anchors, the full tables, sources
Compute: anchors and math
Anchors: Starcloud-1, one H100 (2025) · Google test about 1 kW (10/2026) · TakeMe2Space 1.5 kW a satellite (2028) · Starcloud-2 (2027, company target) · SpaceX AI1 175 kW average a satellite, first launches Q4 2027 (SpaceX target), “as early as 2028” (SEC), “meaningful amounts” by 2029 (SpaceX CFO) · Starship V3 designed for 100+ t to low orbit (design figure; Flight 14 reached orbit with 26 V3 Starlinks and no published payload mass).
Launch math: one Starship with 100 t of AI1 satellites at 75 kW per ton is 7.5 MW a launch, so 1 GW is about 133 launches carrying only compute. SpaceX’s own figure, 100 GW a year from about 1 million t a year, works out to 100 kW per ton.
Year end
Low
Base
High
What has to be true for base
2025
Under 0.01
About 0.01
0.01
Starcloud-1 plus China’s 12 compute satellites (order of magnitude only)
2026
0.01
0.03
0.05
Google, Supercomputing-1, TakeMe2Space, more Three-Body satellites, each about 1 kW class
2027
0.05
2
50
Starcloud-2, Aetherflux, Google’s pair, about 10 AI1 satellites in Q4 (1.75 MW)
2028
1
40
500
About 230 AI1 satellites, 5 to 6 Starship launches
2029
5
250
3,000
About 33 compute launches in total
2030
20
1,000
15,000
About 133 compute launches in total; Starship flying weekly or better
2031
50
2,500
40,000
Second-generation satellites, more operators
SpaceX’s stated aspiration implies far more (10 GW a year around 2029, 100 GW a year around 2030). It is shown as context, not as a case.
Internet: anchors and assumptions
Anchors: 6.0 billion people online in 2025, 74% of the world, 2.2 billion offline (ITU) · 7.3 ZB fixed and 1.5 ZB mobile traffic in 2025, growing about 16% and 19% a year (ITU) · Starlink 8.9M subscribers at end 2025 and 12.0M at 06/30/2026 (SpaceX Q2, SEC) · Forecasts: TMF 35M+ to 45M+ in 2030, Deutsche Bank 102M by 2031 · US fixed broadband 711 GB a month (OpenVault, Q2 2026).
Assumptions: 2.5 people per satellite subscription · Internet users grow 3.3% a year · An average satellite subscription uses 400 GB a month in 2025, rising 10% a year · Yearly traffic uses the average of start and end subscribers · Direct-to-phone satellite service is excluded.
Year end
Satellite subs, low / base / high
People, base
Users from space, low / base / high
Traffic from space, low / base / high
2025
8.9M (actual)
22M
0.37%
0.36%
2026
16 / 18 / 19M
45M
0.65 / 0.73 / 0.77%
0.64 / 0.69 / 0.72%
2027
21 / 25 / 30M
62M
0.82 / 0.98 / 1.17%
0.90 / 1.05 / 1.19%
2028
26 / 31 / 45M
78M
0.98 / 1.17 / 1.70%
1.08 / 1.28 / 1.72%
2029
30 / 36 / 65M
90M
1.10 / 1.32 / 2.38%
1.21 / 1.45 / 2.38%
2030
36 / 42 / 88M
105M
1.27 / 1.49 / 3.12%
1.35 / 1.59 / 3.13%
2031
40 / 48 / 105M
120M
1.37 / 1.65 / 3.60%
1.47 / 1.74 / 3.72%
Base: TMF’s 2030 midpoint (40M) plus about 2M for Amazon Leo and others. High: Deutsche Bank’s path to 102M by 2031 plus others. Capacity is not the limit on share in this window; subscribers are.
A Mars day runs about 40 minutes longer than ours, and a radio message takes minutes to get there. Play with the clocks below.
Key number24 h 39 m 35 s one day on Mars
A day on Mars, a sol, is 24 hours, 39 minutes, 35.244 seconds. So a Mars clock falls about 40 minutes behind ours every day. Coordinated Mars time is one clock for the whole planet, like greenwich time on Earth. A radio message to Mars takes about 13.6 minutes one way today.
Coordinated Mars time
Live
At Jezero Crater, Perseverance’s home (local mean solar time)
Live
Mars sol date
Live
Uses NASA GISS’s Mars24 algorithm. Jezero sits at about 77.5° east (NASA); the rover’s own mission clock can differ by minutes.
Light-delay calculator
13.6 minutes one way
Send it now and it arrives at about 7:44 a.m. ET. A reply would land around 7:57 a.m.
One-way light time at noon ET, 10/04/2026, calc from JPL Horizons. Values are fixed for this edition.
The Briefs · 15 Stories, Current and Upcoming
Around the Industry This Week
15 short stories: crewed dates, Moon and Mars landers, computers in orbit, new money for rockets, and internet from space.
Key dateSummer 2027 Artemis III, a crew docking in Earth orbit (NASA target)
People on the calendar
NASA’s two crewed targets: Artemis III in 2027 and the first crewed Starliner-2 flight in 2028. Why it matters: crewed dates drive budgets and contracts for years.
NASA promised an “Artemis acceleration” update for early October, and the administrator says he is “very confident” in summer 2027 for Artemis III (NASA target). No update was out as of early 10/04
Starliner gets another try: uncrewed to the station in December or January (NASA/Boeing target), then a crewed flight under Woody Hoburg in 2028 (NASA target)
Uncrewed missions go first: Chang’e-7 to the lunar south pole, MMX to Mars’ moons. Why it matters: the south pole may hold water ice, which crews could use for air, water and fuel.
China called off Chang’e-7’s 2026 launch window, and NASA’s chief says the US “may have dodged a bullet” at Shackleton Crater
Estimate: Chang’e-7 launches in 03/2027 and lands near the south pole in 06/2027, two months after an uncrewed Starship’s first Moon landing. Blue Moon Mark 1 (January 2027 on NASA’s list) follows in fall 2027
From Google’s fridge-sized test to plans for thousands of compute satellites. Why it matters: heat is a hard limit on computing in orbit. Each test shows how well a satellite sheds it.
Google’s first orbital data center test is up and “operating as expected”: four TPUs, about 1 kW, 15 minutes of work at a time (Ars)
About $1.56 billion of new money in September for rockets, tugs and reentry (sum: $1 billion + $251 million + $308 million). Why it matters: cheaper rides make every later step cheaper.
Stoke raised $1 billion for a fully reusable rocket and aims for its first orbital try in early 2027 (company target)
Starlink doubled its subscribers in a year; Amazon Leo has not started service yet. Why it matters: satellites reach places cables do not, and about 2.2 billion people were still offline in 2025.
Amazon Leo still plans limited service by year end (company target), after launch delays slowed the build-out
Starlink doubled in a year to 12.0 million subscribers. Average revenue per user fell to $66 from $85 a year earlier, and held there from the first quarter
About 11,100 Starlink satellites are working right now (10/02/2026). Most fly in thin shells about 460 to 490 km up - close enough for a short radio hop. The piece below starts with latency, then builds the fleet one step at a time.
Today, light from Mars takes about 13.6 minutes to reach you (1.640 AU from Earth at noon ET, 10/04/2026), and Mars is closing in by about 650,000 miles a day. Calc from JPL Horizons.
C3, launch energy. The extra speed a ship needs beyond escaping Earth, squared, in km²/s². A lower number means a lighter rocket or more cargo. Mars trips in good windows need about 8 to 20. ↩
Lambert solve. Given two positions and a travel time, it finds the one orbit around the Sun that links them. We run it for many launch and arrival dates and keep the cheapest. "Two-body" means only the Sun pulls on the ship. ↩
Orbital elements, JPL Horizons. Six numbers describe an orbit: its size, shape, tilt and where the planet is on it. JPL publishes a simple set good for centuries; Horizons is JPL’s precise service, which we use as the check. ↩
Sources: NASA (administrator release 12/18/2025; Europa Clipper timeline, FAQ and JPL press kit; Voyager light-day; ESCAPADE; Dragonfly; SR-1 Freedom; Artemis II releases 04/10/2026; potential biosignature 09/10/2025) · JPL Horizons (Europa Clipper record, header revised 09/30/2026, tracking through 09/22/2026) · NASA GISS Mars24 · JAXA 08/20/2026 · ESA Juice calendar and 09/28/2026 flyby · House Appropriations testimony 04/27/2026 · Pod Force One and NY Post 08/05/2026 · CNN and The Guardian 04/05/2026 · CNN 12/17/2025 · WESH 10/01/2026 · Boeing 09/28/2026 · Space.com 01/2026 · Live Science · Ars Technica 09/2026 · Reuters 09/16/2026, 02/06/2026, 01/31/2026 · Xinhua 08/23/2026 · SpacePolicyOnline, Space.com, Spaceflight Now 09/2026 · PCMag 09/04/2026 · China in Space 08/31, 09/20/2026 · SpaceNews 05/07, 09/10/2026 · Payload 09/24/2026 · GeekWire 09/30/2026 · Business Standard 09/28/2026 · Tom’s Hardware 06/09, 09/23/2026 · Google and NPR 10/2026 · SpaceX Starmind page (fetched 10/04/2026) and Q2 release (SEC 08/04/2026) · Nvidia 08/24/2026 · MLQ 08/25/2026 · FCC · DCD 05/12/2026 · Stoke 09/08/2026 · Varda 09/30/2026 · ITU Facts and Figures 2025 · SatNews 06/07/2026 · Advanced Television 07/29/2026 · OpenVault 07/22/2026 · Planet4589 10/02/2026. Estimates are labeled.
Edition 2 · Life beyond Earth · As of 11/16/2026
Stellar Times
Humanity’s journey to the Moon, Mars, and beyond · baa.business
The lead
NASA’s chief likes the odds that Mars once had life.
NASA’s chief sees “a very good chance” that Mars samples will show past life, but the US plan to bring them home is cancelled. Estimate: China’s Tianwen-3 brings the first Mars rock to a lab on Earth.
The edition, one line each
Space exploration forecast. Robots go first — lunar south pole, Mars’s moons, Jupiter, Titan. Estimate: crew on the Moon Sep 2028, on Mars Jun 2029. Hard ops: catch, refill, landers, the 26-month window.
Computers in orbit. Fridge-scale first units, about 1 kW each. Estimate: about 1 GW in orbit by the end of 2030; heat is the hard limit.
Starlink. About eleven thousand working Starlink satellites fly in thin shells a few hundred kilometers up.
Tonight. A Mars day runs about 40 minutes longer than ours, and a radio message takes minutes to get there.
Projections. Base case for 2030: about 1 GW of computing in orbit, and satellites serve about 1 in 65 people online, up from about 1 in 270.
The briefs. 15 short stories: crewed dates, Moon and Mars landers, computers in orbit, new money for rockets, and internet from space.
Ben’s countdown to Mars
06/28/2029
Baa’s bet: first humans on Mars 06/28/2029, at Arcadia Planitia. 955 days from 11/16/2026.
Baa’s bets
Late 11/2026 · hit 11/14/2026 Starship Flight 15 makes the first ship catch at the launch tower hit
Early to mid 01/2027 Starship Flight 16 launches from LC-39A (official date NET TBD) low
04/15/2027 the first uncrewed Starship lands on the Moon low
07/01/2027 the first Starship lands on Mars low
09/15/2028 Artemis IV: the first crew lands on the Moon in a Starship low
06/28/2029 the first human steps onto Mars, at Arcadia Planitia low
04/11/2030 Europa Clipper enters orbit around Jupiter high
03/07/2031 Europa Clipper makes its first close flyby of Europa, just over 200 km up high
End of 2030 about 1 GW of computing in orbit, all operators (base case; range 20 MW to 15 GW) low
2031 the first Mars rock in a lab on Earth is China’s, from Tianwen-3 medium
2055 the first probe melts through Europa’s ice and looks for life in its ocean (launch about 2047) low
Confidence: confidence that the date holds within about 3 months. “Estimate” labels are BAA’s own, from public sources.